The Seefelder - ein fertiges Mini-Quartier
MAGAZIN immobilienkosmos #1
The Seefelder
2020
Nova Property Fund Management AG
Zürich, Switzerland
Residential, office, hotel restaurant, retail
4’800 sqm
Study
Hosoya Schaefer Architects AG
Winkreative
Monocle
immobilien kosmos
Dr. Lüchinger+Meyer Bauingenieure AG
HSSP AG
Martin Hofer
Between lake and city, between city block and solitary villas lies the project “Seefelder”. The unique urban contrast and the extraordinary quality of the location reflect the specific character of the entire quarter.
The new urban piece is both a solitary and a block, both city house and villa, both public and private, unique and generic at the same time. With its urban façade facing Bellerive and Feldeggstrasse, the building fits into its immediate context. On the other hand, the private courtyard to the back breaks this rigor and cascades around the existing willow tree. The result is a multitude of places, niches and spaces that are in dialogue with the diverse functions that the project maps.
Hence, the program includes a hotel with conference areas and co-working spaces, a bar, a restaurant, retail space, long-stay apartments, studios and dwellings. An efficient infrastructure accommodates the various functions. Some are equipped with self-sufficient access, so that they can be used in parallel without conflicts of interest between the individual functions.
The interaction between the different functions and the interaction on the ground floor with the public space create a diverse urban quality, which in its entirety is symbolic of the entire quarter.
MAGAZIN immobilienkosmos #1
Primary School Christoph Merian, Basel, 2019 –
Current phase: construction project
Airport Engadine, St. Moritz, 2020 –
Current phase: construction project
Mobility Hub, Zug, 2019 –
Future Parking Facility with retail component
Current phase: execution
Station Square and Roof, Herisau 2015 –
Current phase: public vote
MEWA-Areal, Wädenswil, 2018 –
Transformation Project from the former industrial estate to the mixed-use development with housing
Current phase: framework plan
Viererfeld, Bern, 2018 –
Housing
Current phase: on hold
Office Renovation, Zug, 2020 –
Current phase: execution
House Renovation, Zug, 2020 –
Current phase: preliminary planning
Wilhelmsburg Rowing Club, 2020 –
Current phase: preliminary planning
Cooperative Housing, Wetzikon, 2020 –
Current phase: preliminary planning
Salina Raurica / Salinenhofquartier, Pratteln, 2018 –
Current state: urban framework plan
Metalli, Zug, 2017 –
Current state: urban framework plan
Tech Cluster Zug, 2015 –
Current state: transformation plan
Elbinselquartier Wilhelmsburg, Hamburg, 2015 –
Current state: design guidelines
Bahnstadt Nürtingen, 2017 –
Current state: design manual
Urban Space Development Concept for SBB Basel Station, 2018 –
Current state: public consultation
KNZ Wil West, Thurgau / St. Gallen, 2011 –
Current state: urban framework plan
Station Area Dietikon, 2019 –
Current state: study with recommendation for further development
Areal Dübendorf, 2020 –
Current state: study
Areal Oerlikon, 2020 –
Current state: study
Areal Dierikon, 2015 –
Current state: urban framework plan
Station Herisau, 2013 –
Current state: areal development
Innovation Park Bergedorf, 2020 –
Current state: urban framework
Seetalstrasse Meierhöfli Emmen, 2020 –
Current state: test planning
ZHA, Boulevard, Hönggerberg Campus, 2020 –
Current state: ongoing (with Studio Vulkan)
Herrliberg-Feldmeilen station, 2020 –
Current state: study
Port City Riga, 2020 –
Current state: Urban design commission
Wankdorffeldstrasse, Bern, 2020 –
Current state: urban design study
St-Karli Brückenköpfe und Reussinsel, Luzern, 2020 –
Current state: urban design study
Campus Bochum, 2018 –
Current state: urban framework plan
Masterplan HB / Central 2050, Zurich, 2020 –
Current state: test planing (with Studio Vulkan)
cividi gmbh – civic data intelligence, 2019 –
Digital tools for the analogue city
Current state: ongoing
The Industrious City – Book Publication, 2017 –
(Lars Müller Publishers)
Published in fall 2020
Workplace Area Development, Winterthur, 2019 –
Current state: ongoing
Network strategy 2040 and
future public transport 2050, Zurich, 2020 –
Current state: ongoing (with IBV Hüsler)