Swiss Box Exploding
Kenchiku Note Extra - United Project Files 01
Europaallee Baufeld E
2007
SBB
Zürich, Switzerland
Office, Housing, Stores
30.000 sqm
Hosoya Schaefer Architects AG, Zürich
Competition with pre-qualification
Arup, London
B&P Bauberatung, Zürich
Hannes Wettstein, Zürich
Raumgleiter GmbH, Zürich
“Stadtraum HB”, known today as the “Europaalle”is a development area of the SBB (Swiss Federal Railways) between Zurich’s main station and the Sihlpost (Post Office) based upon a masterplan by Kees Christiaanse.
The proposal layers functions horizontally, resulting in deep floor slabs that are lit with internal courts and light wells. Since all the layers have different spatial and structural requirements, a flexible hexagonal module was adopted. Each hexagon is supported by three “ribbon columns” that can change orientation relative to the module and move from nodeto node. This allows for smooth adjustments between floors without expensive and inefficient transfer structures. In the front area of the building, the ribbon columns run diagonally through the floors. Together with vertical tension rods, these form a large truss supporting the cantilevered front of the building.
The three housing types are located in towers with their own entrances and are separated by roof-top gardens and terraces.
Kenchiku Note Extra - United Project Files 01
Primary School Christoph Merian, Basel, 2019 –
Current phase: construction project
Airport Engadine, St. Moritz, 2020 –
Current phase: construction project
Mobility Hub, Zug, 2019 –
Future Parking Facility with retail component
Current phase: execution
Station Square and Roof, Herisau 2015 –
Current phase: public vote
MEWA-Areal, Wädenswil, 2018 –
Transformation Project from the former industrial estate to the mixed-use development with housing
Current phase: framework plan
Viererfeld, Bern, 2018 –
Housing
Current phase: on hold
Office Renovation, Zug, 2020 –
Current phase: execution
House Renovation, Zug, 2020 –
Current phase: preliminary planning
Wilhelmsburg Rowing Club, 2020 –
Current phase: preliminary planning
Cooperative Housing, Wetzikon, 2020 –
Current phase: preliminary planning
Salina Raurica / Salinenhofquartier, Pratteln, 2018 –
Current state: urban framework plan
Metalli, Zug, 2017 –
Current state: urban framework plan
Tech Cluster Zug, 2015 –
Current state: transformation plan
Elbinselquartier Wilhelmsburg, Hamburg, 2015 –
Current state: design guidelines
Bahnstadt Nürtingen, 2017 –
Current state: design manual
Urban Space Development Concept for SBB Basel Station, 2018 –
Current state: public consultation
KNZ Wil West, Thurgau / St. Gallen, 2011 –
Current state: urban framework plan
Station Area Dietikon, 2019 –
Current state: study with recommendation for further development
Areal Dübendorf, 2020 –
Current state: study
Areal Oerlikon, 2020 –
Current state: study
Areal Dierikon, 2015 –
Current state: urban framework plan
Station Herisau, 2013 –
Current state: areal development
Innovation Park Bergedorf, 2020 –
Current state: urban framework
Seetalstrasse Meierhöfli Emmen, 2020 –
Current state: test planning
ZHA, Boulevard, Hönggerberg Campus, 2020 –
Current state: ongoing (with Studio Vulkan)
Herrliberg-Feldmeilen station, 2020 –
Current state: study
Port City Riga, 2020 –
Current state: Urban design commission
Wankdorffeldstrasse, Bern, 2020 –
Current state: urban design study
St-Karli Brückenköpfe und Reussinsel, Luzern, 2020 –
Current state: urban design study
Campus Bochum, 2018 –
Current state: urban framework plan
Masterplan HB / Central 2050, Zurich, 2020 –
Current state: test planing (with Studio Vulkan)
cividi gmbh – civic data intelligence, 2019 –
Digital tools for the analogue city
Current state: ongoing
The Industrious City – Book Publication, 2017 –
(Lars Müller Publishers)
Published / available on Lars Müller Publishers website and in bookstores.
Workplace Area Development, Winterthur, 2019 –
Current state: ongoing
Network strategy 2040 and
future public transport 2050, Zurich, 2020 –
Current state: ongoing (with IBV Hüsler)