ArchDaily
Nominated - "Mobility Hub Zug Nord" in the Public & Landscape Architecture category.
Mobility Hub Zug Nord
2015-2022
Urban Assets Zug AG
Zug, Switzerland
Mobility terminal, parking garage, retail
17’000 sqm
565 indoor parking spaces
31 outdoor parking spaces
Direct commission
Hosoya Schaefer Architects AG
Andy Wickart Haustechnik AG
Bänziger Partner AG
Cerutti Partner Architekten AG
Conzett Bronzini Partner AG
Hefti. Hess. Martignoni. AG
IBV Hüsler AG
Land Schafft GmbH
Martinelli & Menti AG
Moos Bauingenieure AG
Pirmin Jung Ingenieure AG
Filippo Bolognese
Valentin Jeck
Rasmus Norlander
Jos Schmid
Hosoya Schaefer Architects
Mobility Hub Zug Nord (MHZN) is not an ordinary parking garage. It forms the entrance to the Tech Cluster Zug (TCZ) via the curved pedestrian bridge but is also the gateway to the city. It is a building directly connected to the Zug-Baar motorway bypass and to a public transport network that in the future will no longer consist only of trains or buses.
At the MHZN, for example, visitors will change to a self-driven bus, which will take them either to the TCZ or to the city. In addition, car park users can rent e-bikes or e-scooters at any time to cover individual routes with great precision. The fact that such a hub will be equipped with charging stations for electric vehicles is hardly worth mentioning these days. The MHZN will, however, be designed in such a way that in the future it will have a fully automated parking system with self-parking vehicles.
Well-thought-out concepts such as these are what make the MHZN an intelligent building. The MHZN with an integrated bistro and a shop of HandwerkStadt Zug is intended not the least to advance the development of Zug as a Smart City by testing and refining novel mobility concepts.
The Tech Cluster Zug is a development project which will transform the factory site of V-Zug over many phases into an innovative cluster of urban industry. Since 2013, Hosoya Schaefer Architects are working on the masterplan and transformation.
Nominated - "Mobility Hub Zug Nord" in the Public & Landscape Architecture category.
Neues vom Tech Cluster Zug
arc award mag 6/2022
Immobilien im BlickPunkt, Nr. 4
architektur, bauen + handwerk 2019/20 zentralschweiz
LANDIS NEWS Nr.5 2021
Neues vom Tech Cluster Zug
Neues vom Tech Cluster Zug
Neues vom Tech Cluster Zug
Neues vom Technologiecluster Zug
Morgentalquartier, Wetzikon, 2020 –
Program: Housing
Current state: Phase 51 and 52, under construction
Haus Myrte, Wädenswil, 2022 –
Program: Transformation of historical building
Current state: Phases 51 and 52, under construction
Station Square and Roof, Herisau 2015 –
Program: Station square, station roof, bus roof
Current state: Phase 41, under construction (partially)
MEWA-Areal, Wädenswil, 2018 –
Program: Culture, Restaurant, Housing, Retail
Current state: Phase 31, preliminary design
Wilhelmsburg Rowing Clug, Wilhelmsburg (D), 2020 –
Program: Clubhouse, boat hall
Current state: Execution Pla
House A, Geneva, 2021 –
Program: Residential house
Current state: Renovation, ongoing
Primary School Christoph Merian, Basel, 2019 –
Program: School
Current state: ongoing
Herriberg-Feldmeilen station, 2020 –
Program: Retail, housing, bus yard
Current state: framework plan
Airport Engadin, St. Moritz, 2020 –
Current phase: construction project
Cooperative Housing, Wetzikon, 2020 –
Current phase: tender
Fabrik.sg, 2020 –
Current phase: Project phases design to operation
Boulevard, ETHZ Hönggerberg Campus, 2020 –
Program: Campus Boulevard redesign (with Studio Vulkan)
Current state: ongoing
Viererfeld, Bern, 2018 –
Program: Housing
Current state: on hold
Bahnhof Romanshorn, 2022 –
Current state: study (with Sudio Vulkan)
Kaserne Aarau, 2022 –
Current state: urban framework
Areale Wittenbach, 2022 –
Current state: urban design commission
Stiftungsareal Neumünster, 2022 –
Current state: study
Kieler Schloss, 2022 –
Current state: Public think tank on usage and architecture
Campus Heidelberg, 2021 –
Current state: Masterplan process, in-depth studies
Otterbach Süd, 2020 –
Current state: urban framework plan
Innovation Park Bergedorf, 2020 –
Current state: urban framework
Station Area Dietikon, 2019 –
Current state: urban framework plan
Campus Bochum, 2018 –
Current state: project support
Metalli, Zug, 2017 –
Current state: project support
Bahnstadt Nürtingen, 2017 –
Current state: project support
Areal Neugasse Zürich, 2016 –
Current state: completion of master plan, public consultation
Elbinselquartier Wilhelmsburg, Hamburg, 2015 –
Current state: project support
Tech Cluster Zug, 2015 –
Current state: transformation plan
Station Herisau, 2013 –
Current state: areal development
KNZ Wil West, Thurgau / St. Gallen, 2011 –
Current state: project support
Metaverse, 2022 –
Current state: ongoing
Entwicklungskonzept Würzenbach, 2022 –
Current state: ongoing
ESP Hochdorf, 2021 –
Current state: spatial-urban as well as use- and circular-based development concept
Deep Urbanism, 2021 –
Current state: ongoing
cividi gmbh – civic data intelligence, 2019 –
Digital tools for the analogue city
Current state: ongoing