Project:

MEWA-Areal Wädenswil

Year:

2018 -

Client:

Blattmann Metallwarenfabrik AG, Wädenswil

Location:

Wädenswil, Switzerland

Program:

Culture, Restaurant, Retail, Housing

Area:

17'500 qm

Commission:

Invited Competition, 1st Prize

architect:

Hosoya Schaefer Architects AG

Planning team:

Müller Illien Landschaftsarchitekten
Dr. Lüchinger+Meyer Bauingenieure AG
IBV Hüsler AG

Visualization:

Filippo Bolognese

New Development MEWA-Areal Wädenswil

Continuing a heritage

The MEWA Areal exists as an island embedded between juxtapositions – between the noise of the Zugerstrasse and the enchanting garden idyll in the back, between the city center at the lake and the hill shoulder of the Hangenmoos neighborhood, between its heritage as a Swiss industrial pioneer and its future as a vibrant new neighborhood.

The project sits on the footprint of the historic conglomeration of industrial buildings, partly demolished or preserved, interpreted anew or transformed, creating in a dialogue with history and nature a new ensemble. The existing brook running through the site becomes both a seam and a path that links the industrial estate to the garden park.

The industrial legacy remains inscribed in the memory of the place and yet is reinterpreted anew.

Making a place

The ensemble of Haus Myrthe and the former production hall with its distinctive butterfly-roof becomes the identity creating artifact, referencing the history of the area. At the heart of the development, surrounding the production hall, lies a community foyer and winter-garden along with an adjoining multifunctional space. These three open spaces induce a dynamic interplay of functions – cultural use, service and gastronomy. The result is a small urban biotope with Haus Myrthe, a community center entrance, gastronomy and an address at Zugerstrasse on the southern side. A community courtyard figuratively extends from the foyer – including a commercial space, child daycare center, an atelier as well as direct access to the underground mobility garage.  At the rear of the multifunctional space lies access to the brook, a view onto the garden-park and a potential beer garden in the summer. A diversity of usage scenarios is conceivable depending on the occasion – from small scale handcraft to larger, cultural production. The former company site awakens around this core to a new and diverse life.

Projects

Architecture

Primary School Christoph Merian, Basel, 2019 –
Current phase: construction project

Airport Engadine, St. Moritz, 2020 –
Current phase: construction project

Mobility Hub, Zug, 2019 –
Future Parking Facility with retail component
Current phase: execution

Station Square and Roof, Herisau 2015 –
Current phase: public vote

MEWA-Areal, Wädenswil, 2018 –
Transformation Project from the former industrial estate to the mixed-use development with housing
Current phase: framework plan

Viererfeld, Bern, 2018 –
Housing
Current phase: on hold

Office Renovation, Zug, 2020 –
Current phase: execution

House Renovation, Zug, 2020 –
Current phase: preliminary planning

Wilhelmsburg Rowing Club, 2020 –
Current phase: preliminary planning

Cooperative Housing, Wetzikon, 2020 –
Current phase: preliminary planning

Urban Design

Salina Raurica / Salinenhofquartier, Pratteln, 2018 –
Current state: urban framework plan

Metalli, Zug, 2017 –
Current state: urban framework plan

Tech Cluster Zug, 2015 –
Current state: transformation plan

Elbinselquartier Wilhelmsburg, Hamburg, 2015 –
Current state: design guidelines

Bahnstadt Nürtingen, 2017 –
Current state: design manual

Urban Space Development Concept for SBB Basel Station, 2018 –
Current state: public consultation

KNZ Wil West, Thurgau / St. Gallen, 2011 –
Current state: urban framework plan

Station Area Dietikon, 2019 –
Current state: study with recommendation for further development

Areal Dübendorf, 2020 –
Current state: study

Areal Oerlikon, 2020 –
Current state: study

Areal Dierikon, 2015 –
Current state: urban framework plan

Station Herisau, 2013 –
Current state: areal development

Innovation Park Bergedorf, 2020 –
Current state: urban framework

Seetalstrasse Meierhöfli Emmen, 2020 –
Current state: test planning

ZHA, Boulevard, Hönggerberg Campus, 2020 –
Current state: ongoing (with Studio Vulkan)

Herrliberg-Feldmeilen station, 2020 –
Current state: study

Port City Riga, 2020 –
Current state: Urban design commission

Wankdorffeldstrasse, Bern, 2020 –
Current state: urban design study

St-Karli Brückenköpfe und Reussinsel, Luzern, 2020 –
Current state: urban design study

Campus Bochum, 2018 –
Current state: urban framework plan

Masterplan HB / Central 2050, Zurich, 2020 –
Current state: test planing (with Studio Vulkan)

Urban System Research

cividi gmbh – civic data intelligence, 2019 –
Digital tools for the analogue city
Current state: ongoing

The Industrious City – Book Publication, 2017 –
(Lars Müller Publishers)
Published in fall 2020

Workplace Area Development, Winterthur, 2019 –
Current state: ongoing

Network strategy 2040 and
future public transport 2050, Zurich, 2020 –
Current state: ongoing (with IBV Hüsler)

Contact

Zürich office

Flüelastrasse 10, 8048 Zürich, Switzerland (Google Maps)
T. +41 43 243 6313F. +41 43 243 6315
office@hosoyaschaefer.com

Kyoto office

Jimukinoueda bldg. 603, 21 Sakaicho, Gojo-Takakurakado, Shimogyoku, Kyoto 600-819, Japan
T. +81 75 744 1503
office@hosoyaschaefer.com