La Rasude
2015
Mobimo, SBB
Lausanne, Switzerland
Retail, offices, hotel, housing, fitness center, restaurant
GFA 76'000 sqm
Invited Competition
Müller Illien Landschaftsarchitekten
Pöyvry Schweiz AG
mrs partner sa
hssp AG
Müller Illien Landschaftsarchitekten Zürich
Pöyvry Schweiz AG, Zurich
mrs partner sa Zürich
hssp Zürich
RSI-Studio, Paris
This project proposes to transform the old postal complex along the railway into urban terraces structured by the public esplanade “La Rasude”.
It completes the new museum hub located at the west of the station with a strong gesture of public urbanism to the east. The new public space offers clear access to pedestrians and thus improves the site in the urban fabric of the city.
The esplanade connects the “Place de la Gare” to the “Avenue d’Ouchy” and the “Montchoisi” district to the south-east. Offering a clear view of the Alps and visibility from the railway, the project creates a strong identity on a regional scale.
The four-star hotel is located at the “Place de la Gare” and marks a distinctive beginning or ending of the site. The office buildings and shops have street addresses of the “Avenue de la Gare” supporting the city scale. The commercial spaces are organized facing the “Place de la Gare”. At the neighbourhood scale, the alleys with entrances to the housings connect the avenue to the esplanade and allow visual connections. Like an urban beach, the public space gives the city access to the sun and the view.
This urban project is a composite of new and old buildings. Two groups of buildings per phase offer space for two large companies, and the plans can be flexibly adapted to smaller units. The residential units have a favourable orientation and a superb view. The realization can take place in two or more phases. Each step includes a mix of functions and contributes to a strong image value for the station area.
Primary School Christoph Merian, Basel, 2019 –
Current phase: construction project
Airport Engadine, St. Moritz, 2020 –
Current phase: construction project
Mobility Hub, Zug, 2019 –
Future Parking Facility with retail component
Current phase: execution
Station Square and Roof, Herisau 2015 –
Current phase: public vote
MEWA-Areal, Wädenswil, 2018 –
Transformation Project from the former industrial estate to the mixed-use development with housing
Current phase: framework plan
Viererfeld, Bern, 2018 –
Housing
Current phase: on hold
Office Renovation, Zug, 2020 –
Current phase: execution
House Renovation, Zug, 2020 –
Current phase: preliminary design
Wilhelmsburg Rowing Club, 2020 –
Current phase: preliminary design
Cooperative Housing, Wetzikon, 2020 –
Current phase: preliminary design
House Renovation, Geneva, 2021 –
Current phase: preliminary design
Salina Raurica / Salinenhofquartier, Pratteln, 2018 –
Current state: urban framework plan
Metalli, Zug, 2017 –
Current state: urban framework plan
Tech Cluster Zug, 2015 –
Current state: transformation plan
Elbinselquartier Wilhelmsburg, Hamburg, 2015 –
Current state: design guidelines
Bahnstadt Nürtingen, 2017 –
Current state: design manual
Urban Space Development Concept for SBB Basel Station, 2018 –
Current state: public consultation
KNZ Wil West, Thurgau / St. Gallen, 2011 –
Current state: urban framework plan
Station Area Dietikon, 2019 –
Current state: study with recommendation for further development
Areal Dübendorf, 2020 –
Current state: study
Areal Oerlikon, 2020 –
Current state: study
Areal Dierikon, 2015 –
Current state: urban framework plan
Station Herisau, 2013 –
Current state: areal development
Innovation Park Bergedorf, 2020 –
Current state: urban framework
Seetalstrasse Meierhöfli Emmen, 2020 –
Current state: test planning
ZHA, Boulevard, Hönggerberg Campus, 2020 –
Current state: ongoing (with Studio Vulkan)
Herrliberg-Feldmeilen station, 2020 –
Current state: study
Port City Riga, 2020 –
Current state: Urban design commission
Wankdorffeldstrasse, Bern, 2020 –
Current state: urban design study
St-Karli Brückenköpfe und Reussinsel, Luzern, 2020 –
Current state: urban design study
Campus Bochum, 2018 –
Current state: urban framework plan
Masterplan HB / Central 2050, Zurich, 2020 –
Current state: test planing (with Studio Vulkan)
cividi gmbh – civic data intelligence, 2019 –
Digital tools for the analogue city
Current state: ongoing
The Industrious City – Book Publication, 2017 –
(Lars Müller Publishers)
Published / available on Lars Müller Publishers website and in bookstores.
Workplace Area Development, Winterthur, 2019 –
Current state: ongoing
Network strategy 2040 and
future public transport 2050, Zurich, 2020 –
Current state: ongoing (with IBV Hüsler)