Project:

OTTERBACH FOREST ARCHIPELAGO

Year:

2020

Client:

Municipality City of Basel (CH), Municipality City Weil am Rhein (DE)

Location:

Otterbach, Switzerland/Germany

Program:

Mixed-use Living Quarter

Area:

106’430 sqm

Commission:

Competition with pre-qualification: 1st Prize

ARCHITECT:

Hosoya Schaefer Architects AG

PLANNING TEAM:

Agence Ter.de GmbH

VISUALIZATION:

Bloom Images

FOREST ARCHIPELAGO OTTERBACH SÜD – LIVING WITHIN NATURE

The area Otterbach South is located at the Swiss-German border between the cities of Basel (CH) and Weil am Rhein (D). Surrounded by forests to the south and northeast, and railways to the west, the site is adjacent to the Landschaftspark Wiese (Landscape Park Wiese) characterized by an attractive and rich landscape scenery.

In accord with the surroundings, the so-called “forest islands” form the basis of the concept. They consist of open, polygonal block structures situated freely in the landscape resembling islands that only occasionally adjoin each other. The building plots of the new quarter feature clearly defined spatial boundaries set in relation to the existing large greenhouse and the prominent figures of the nearby forest and embankment.

The open space, in turn, brings the forest into the quarter and takes the form of individual fragments shaped as small forest islands. This creates a particular living quality and features an ecological, climatic and pedestrian network which links Nonnenholz and Lange Erlen with a distinct, near-natural and low-maintenance environment. This car-free, publicly accessible green space is designed as a recreational and resident-oriented area that does not have typical street cross-sections but instead widens and narrows in profile.

Projects

Architecture

Primary School Christoph Merian, Basel, 2019 –
Current phase: construction project

Airport Engadine, St. Moritz, 2020 –
Current phase: construction project

Mobility Hub, Zug, 2019 –
Future Parking Facility with retail component
Current phase: execution

Station Square and Roof, Herisau 2015 –
Current phase: public vote

MEWA-Areal, Wädenswil, 2018 –
Transformation Project from the former industrial estate to the mixed-use development with housing
Current phase: framework plan

Viererfeld, Bern, 2018 –
Housing
Current phase: on hold

Office Renovation, Zug, 2020 –
Current phase: execution

House Renovation, Zug, 2020 –
Current phase: preliminary planning

Wilhelmsburg Rowing Club, 2020 –
Current phase: preliminary planning

Cooperative Housing, Wetzikon, 2020 –
Current phase: preliminary planning

Urban Design

Salina Raurica / Salinenhofquartier, Pratteln, 2018 –
Current state: urban framework plan

Metalli, Zug, 2017 –
Current state: urban framework plan

Tech Cluster Zug, 2015 –
Current state: transformation plan

Elbinselquartier Wilhelmsburg, Hamburg, 2015 –
Current state: design guidelines

Bahnstadt Nürtingen, 2017 –
Current state: design manual

Urban Space Development Concept for SBB Basel Station, 2018 –
Current state: public consultation

KNZ Wil West, Thurgau / St. Gallen, 2011 –
Current state: urban framework plan

Station Area Dietikon, 2019 –
Current state: study with recommendation for further development

Areal Dübendorf, 2020 –
Current state: study

Areal Oerlikon, 2020 –
Current state: study

Areal Dierikon, 2015 –
Current state: urban framework plan

Station Herisau, 2013 –
Current state: areal development

Innovation Park Bergedorf, 2020 –
Current state: urban framework

Seetalstrasse Meierhöfli Emmen, 2020 –
Current state: test planning

ZHA, Boulevard, Hönggerberg Campus, 2020 –
Current state: ongoing (with Studio Vulkan)

Herrliberg-Feldmeilen station, 2020 –
Current state: study

Port City Riga, 2020 –
Current state: Urban design commission

Wankdorffeldstrasse, Bern, 2020 –
Current state: urban design study

St-Karli Brückenköpfe und Reussinsel, Luzern, 2020 –
Current state: urban design study

Campus Bochum, 2018 –
Current state: urban framework plan

Masterplan HB / Central 2050, Zurich, 2020 –
Current state: test planing (with Studio Vulkan)

Urban System Research

cividi gmbh – civic data intelligence, 2019 –
Digital tools for the analogue city
Current state: ongoing

The Industrious City – Book Publication, 2017 –
(Lars Müller Publishers)
Published in fall 2020

Workplace Area Development, Winterthur, 2019 –
Current state: ongoing

Network strategy 2040 and
future public transport 2050, Zurich, 2020 –
Current state: ongoing (with IBV Hüsler)

Contact

Zürich office

Flüelastrasse 10, 8048 Zürich, Switzerland (Google Maps)
T. +41 43 243 6313F. +41 43 243 6315
office@hosoyaschaefer.com

Kyoto office

Jimukinoueda bldg. 603, 21 Sakaicho, Gojo-Takakurakado, Shimogyoku, Kyoto 600-819, Japan
T. +81 75 744 1503
office@hosoyaschaefer.com