Boulevard, ETH Hönggerberg
2020 -
ETH Zürich, Abteilung Immobilien
Zürich, Switzerland
Campus Boulevard redesign
Competition with pre-qualification, 1st Prize
Hosoya Schaefer Architects AG
arc lighting in architecture
Dress & Sommer Schweiz AG
Henauer Gugler AG
mrs Gugler AG
R+B engineering ag
Studio Vulkan GmbH
Zimraum GmbH,
Atelier Brunecky
With the construction and the commitment to a boulevard, the Hönggerberg campus transitions from its originally conception as a campus landscape to a knowledge city whose central element becomes the boulevard. The boulevard connotation insinuates ideas of urban centrality that seem only partially realistic for a knowledge community of about 20,000 people. The project therefore creates a central square space, based on the existing campus, which can realistically fulfill its urban objective through the concentration of uses and spaces for movement.
This concentration simultaneously creates space for very specific needs of the Campus Hönggerberg: In a time that seems to be moving ever faster, efficient access to the campus is of great importance. At the same time, as a knowledge setting, the campus requires informal meeting places located at highly frequented locations, analogous to the coffee machines in large companies. To this end, on the boulevard, two needs that at first glance seem to contradict each other are negotiated.
Herrliberg-Feldmeilen station, 2020 –
Current state: framework plan
Haus Myrte, Wädenswil, 2022 –
Current phase: tender
House Renovation, Geneva, 2021 –
Current phase: ongoing
Airport Engadin, St. Moritz, 2020 –
Current phase: construction project
Cooperative Housing, Wetzikon, 2020 –
Current phase: tender
Fabrik.sg, 2020 –
Current phase: Project phases design to operation
ZHA, Boulevard, Hönggerberg Campus, 2020 –
Current state: ongoing (with Studio Vulkan)
Wilhelmsburg Rowing Club, 2020 –
Current phase: execution planning
Primary School Christoph Merian, Basel, 2019 –
Current phase: construction project
Station Square and Roof, Herisau 2015 –
Current phase: tender
MEWA-Areal, Wädenswil, 2018 –
Transformation Project from the former industrial estate to the mixed-use development with housing
Current phase: framework plan
Viererfeld, Bern, 2018 –
Housing
Current phase: on hold
Bahnhof Romanshorn, 2022 –
Current state: study (with Sudio Vulkan)
Kaserne Aarau, 2022 –
Current state: urban framework
Areale Wittenbach, 2022 –
Current state: urban design commission
Stiftungsareal Neumünster, 2022 –
Current state: study
Kieler Schloss, 2022 –
Current state: Public think tank on usage and architecture
Campus Heidelberg, 2021 –
Current state: Masterplan process, in-depth studies
Otterbach Süd, 2020 –
Current state: urban framework plan
Innovation Park Bergedorf, 2020 –
Current state: urban framework
Station Area Dietikon, 2019 –
Current state: urban framework plan
Campus Bochum, 2018 –
Current state: project support
Metalli, Zug, 2017 –
Current state: project support
Bahnstadt Nürtingen, 2017 –
Current state: project support
Areal Neugasse Zürich, 2016 –
Current state: completion of master plan, public consultation
Elbinselquartier Wilhelmsburg, Hamburg, 2015 –
Current state: project support
Tech Cluster Zug, 2015 –
Current state: transformation plan
Station Herisau, 2013 –
Current state: areal development
KNZ Wil West, Thurgau / St. Gallen, 2011 –
Current state: project support
Metaverse, 2022 –
Current state: ongoing
Entwicklungskonzept Würzenbach, 2022 –
Current state: ongoing
ESP Hochdorf, 2021 –
Current state: spatial-urban as well as use- and circular-based development concept
Deep Urbanism, 2021 –
Current state: ongoing
cividi gmbh – civic data intelligence, 2019 –
Digital tools for the analogue city
Current state: ongoing