Bahnstadt Nürtingen
2017 -
City of Nürtingen
Nürtingen, Germany
Mixed use, Residential, Office, Public Functions
10 ha
Open two-phased competition, 1st prize
Hosoya Schaefer Architects AG
Agence Ter, Karlsruhe
IBV Hüsler AG
Nürtinger Zeitung, 22.12.2017
Stuttgarter Nachrichten, 15.11.2017
Stuttgarter Nachrichten, 19.09.2017
The existing connections across the railway are revitalized and enhanced with new public spaces and squares on both sides of the tracks. The adjacent urban fabric is repaired at the edges and developed towards the tracks. The existing links around the station are combined into a new square to create a simple and distinct connection. Spacious entrances allow the connections to become more visible within the urban structure.
A clearly defined Spinnereiplatz becomes the counterpart to the new station square and creates the entry point for the new urban quarter. It also functions as a hinge between Bahnstadt-Ost, Kirchheimer Vorstadt, the mobility hub and the residential areas of Säer and Saubachpassage.
The new urban quarter offers a robust urban framework with differentiated blocks. It incorporates the elongated Kirchheimer Vorstadt blocks as a reference and thus completes the quarter towards the hillside. A variety of typologies, ranging from single and double townhouses to apartment buildings of different sizes, as well as a range of commercial, retail and office functions and uses – all form a new vibrant urban quarter.
A sequence of public spaces oriented in the east-west direction – a small plaza, a community space, a passage and a neighborhood square – create a new centrality and improved connectivity, thus enforcing the network throughout the local and greater area.
Primary School Christoph Merian, Basel, 2019 –
Current phase: construction project
Airport Engadine, St. Moritz, 2020 –
Current phase: construction project
Mobility Hub, Zug, 2019 –
Future Parking Facility with retail component
Current phase: execution
Station Square and Roof, Herisau 2015 –
Current phase: public vote
MEWA-Areal, Wädenswil, 2018 –
Transformation Project from the former industrial estate to the mixed-use development with housing
Current phase: framework plan
Viererfeld, Bern, 2018 –
Housing
Current phase: on hold
Office Renovation, Zug, 2020 –
Current phase: execution
House Renovation, Zug, 2020 –
Current phase: preliminary planning
Wilhelmsburg Rowing Club, 2020 –
Current phase: preliminary planning
Cooperative Housing, Wetzikon, 2020 –
Current phase: preliminary planning
Salina Raurica / Salinenhofquartier, Pratteln, 2018 –
Current state: urban framework plan
Metalli, Zug, 2017 –
Current state: urban framework plan
Tech Cluster Zug, 2015 –
Current state: transformation plan
Elbinselquartier Wilhelmsburg, Hamburg, 2015 –
Current state: design guidelines
Bahnstadt Nürtingen, 2017 –
Current state: design manual
Urban Space Development Concept for SBB Basel Station, 2018 –
Current state: public consultation
KNZ Wil West, Thurgau / St. Gallen, 2011 –
Current state: urban framework plan
Station Area Dietikon, 2019 –
Current state: study with recommendation for further development
Areal Dübendorf, 2020 –
Current state: study
Areal Oerlikon, 2020 –
Current state: study
Areal Dierikon, 2015 –
Current state: urban framework plan
Station Herisau, 2013 –
Current state: areal development
Innovation Park Bergedorf, 2020 –
Current state: urban framework
Seetalstrasse Meierhöfli Emmen, 2020 –
Current state: test planning
ZHA, Boulevard, Hönggerberg Campus, 2020 –
Current state: ongoing (with Studio Vulkan)
Herrliberg-Feldmeilen station, 2020 –
Current state: study
Port City Riga, 2020 –
Current state: Urban design commission
Wankdorffeldstrasse, Bern, 2020 –
Current state: urban design study
St-Karli Brückenköpfe und Reussinsel, Luzern, 2020 –
Current state: urban design study
Campus Bochum, 2018 –
Current state: urban framework plan
Masterplan HB / Central 2050, Zurich, 2020 –
Current state: test planing (with Studio Vulkan)
cividi gmbh – civic data intelligence, 2019 –
Digital tools for the analogue city
Current state: ongoing
The Industrious City – Book Publication, 2017 –
(Lars Müller Publishers)
Published in fall 2020
Workplace Area Development, Winterthur, 2019 –
Current state: ongoing
Network strategy 2040 and
future public transport 2050, Zurich, 2020 –
Current state: ongoing (with IBV Hüsler)