Project:

Altdorf Station

Year:

2017

Client:

Urner Kantonalbank, Altdorf

Location:

Altdorf, Switzerland

Program:

Office, industry, bank headquarter, train station

Area:

10,000 sqm

Commission:

Invited competition, 3rd Price

Architects:

Hosoya Schaefer Architects AG

Construction Management:

HSSP AG

Traffic:

IBV Hüsler AG

Structure:

Schnetzer Puskas Ingenieure AG

Landscape:

Tschumi Landschaftsarchitektur

Train Station and Service Building

Freight shed, Slab and tower – The project at the Altdorf train station completes the context with a readable ensemble characteristic for the Alpine region. It defines a sequence of public spaces along the tracks and enables public live creating a new identity within the mountainous landscape.

The ensemble combines Urner Kantonalbank headquarters, several service and train related facilities for travelers along the swiss north-south axis while also acting as hub for regional traffic.
The new buildings strengthen the axis along Bahnhofstrasse with a representative façade and a new square marks the starting point of the gateway across the Alps.

The project respects the existing protected station building and integrates it into the new urban configuration. The elongated main building with stepped story sideways keeps a low silhouette and connects to the existing freight shed. Towards the south the tower marks and defines the square and marks the gateway across the alps. A site with the appropriate scales and height development emerges, a play in between old and new.
The transparent ground floor includes a market hall and brings a visual connection with the tracks through an open passage. A place to encounters, dis- and embarkment and dwell.

Projects

Architecture

Primary School Christoph Merian, Basel, 2019 –
Current phase: construction project

Airport Engadine, St. Moritz, 2020 –
Current phase: construction project

Mobility Hub, Zug, 2019 –
Future Parking Facility with retail component
Current phase: execution

Station Square and Roof, Herisau 2015 –
Current phase: public vote

MEWA-Areal, Wädenswil, 2018 –
Transformation Project from the former industrial estate to the mixed-use development with housing
Current phase: framework plan

Viererfeld, Bern, 2018 –
Housing
Current phase: on hold

Office Renovation, Zug, 2020 –
Current phase: execution

House Renovation, Zug, 2020 –
Current phase: preliminary design

Wilhelmsburg Rowing Club, 2020 –
Current phase: preliminary design

Cooperative Housing, Wetzikon, 2020 –
Current phase: preliminary design

House Renovation, Geneva, 2021 –
Current phase: preliminary design

Urban Design

Salina Raurica / Salinenhofquartier, Pratteln, 2018 –
Current state: urban framework plan

Metalli, Zug, 2017 –
Current state: urban framework plan

Tech Cluster Zug, 2015 –
Current state: transformation plan

Elbinselquartier Wilhelmsburg, Hamburg, 2015 –
Current state: design guidelines

Bahnstadt Nürtingen, 2017 –
Current state: design manual

Urban Space Development Concept for SBB Basel Station, 2018 –
Current state: public consultation

KNZ Wil West, Thurgau / St. Gallen, 2011 –
Current state: urban framework plan

Station Area Dietikon, 2019 –
Current state: study with recommendation for further development

Areal Dübendorf, 2020 –
Current state: study

Areal Oerlikon, 2020 –
Current state: study

Areal Dierikon, 2015 –
Current state: urban framework plan

Station Herisau, 2013 –
Current state: areal development

Innovation Park Bergedorf, 2020 –
Current state: urban framework

Seetalstrasse Meierhöfli Emmen, 2020 –
Current state: test planning

ZHA, Boulevard, Hönggerberg Campus, 2020 –
Current state: ongoing (with Studio Vulkan)

Herrliberg-Feldmeilen station, 2020 –
Current state: study

Port City Riga, 2020 –
Current state: Urban design commission

Wankdorffeldstrasse, Bern, 2020 –
Current state: urban design study

St-Karli Brückenköpfe und Reussinsel, Luzern, 2020 –
Current state: urban design study

Campus Bochum, 2018 –
Current state: urban framework plan

Masterplan HB / Central 2050, Zurich, 2020 –
Current state: test planing (with Studio Vulkan)

Urban System Research

cividi gmbh – civic data intelligence, 2019 –
Digital tools for the analogue city
Current state: ongoing

The Industrious City – Book Publication, 2017 –
(Lars Müller Publishers)
Published / available on Lars Müller Publishers website and in bookstores.

Workplace Area Development, Winterthur, 2019 –
Current state: ongoing

Network strategy 2040 and
future public transport 2050, Zurich, 2020 –
Current state: ongoing (with IBV Hüsler)

Contact

Zürich office

Flüelastrasse 10, 8048 Zürich, Switzerland (Google Maps)
T. +41 43 243 6313F. +41 43 243 6315
office@hosoyaschaefer.com

Kyoto office

Jimukinoueda bldg. 603, 21 Sakaicho, Gojo-Takakurakado, Shimogyoku, Kyoto 600-8191, Japan
T. +81 75 744 1503
office@hosoyaschaefer.com