SCALE SHIFT

DESIGN STUDIO – AKADEMIE DER BILDENDEN KÜNSTE, WIEN 2008

This studio is the third in a series of research inquiries about creating something unexpected from a singular starting point. Through research, design, and fabrication, students explore the potential, the structural use, and the life cycle of contemporary building materials. Aside from addressing the history of technology and the production of materials in the context of modernity, this research studio looks at flexible, changing, and modular systems, using aluminum as a main structural element.

CREDITS

Project: Academic Research and Teaching
Year: 2008
School: Akademie der buildenden Künste, Wien
Location: Vienna, Austria
Platform: Material, Construction, Technology
Instructor: Univ. -Prof. Hiromi Hosoya
Assistant:
Christina Condak
Expert: Mitsuhiro Kanada and Nicolas Sterling, Arup

Projects

Architecture

Primary School Christoph Merian, Basel, 2019 –
Current phase: preliminary design

Airport Engadine, St. Moritz, 2020 –
Current phase: preliminary design

Mobility Hub, Zug, 2019 –
Future Parking Facility with retail component
Current phase: tender documentation

Station Square and Roof, Herisau 2015 –
Current phase: public vote

MEWA-Areal, Wädenswil, 2018 –
Transformation Project from the former industrial estate to the mixed-use development with housing
Current phase: framework plan

Viererfeld, Bern, 2018 –
Housing
Current phase: on hold

Office Renovation, Zug, 2020 –
Current phase: execution

House Renovation, Zug, 2020 –
Current phase: study

Urban Design

Salina Raurica / Salinenhofquartier, Pratteln, 2018 –
Current state: urban framework plan

Metalli, Zug, 2017 –
Current state: urban framework plan

Tech Cluster Zug, 2015 –
Current state: transformation plan

Elbinselquartier Wilhelmsburg, Hamburg, 2015 –
Current state: design guidelines

Bahnstadt Nürtingen, 2017 –
Current state: design manual

KNZ Wil West, Thurgau / St. Gallen, 2011 –
Current state: urban framework plan

Bell-Areal, Kriens, 2020 –
Current state: competition

Station Area Dietikon, 2019 –
Current state: study with recommendation for further development

Areal Dübendorf, 2020 –
Current state: study

Areal Oerlikon, 2020 –
Current state: study

Areal Dierikon, 2015 –
Current state: urban framework plan

Station Herisau, 2013 –
Current state: areal development

Urban System Research

cividi gmbh – civic data intelligence, 2019 –
Digital tools for the analogue city
Current state: ongoing

The Industrious City – Book Publication, 2017 –
(Lars Müller Publishers)
Published in fall 2020

Workplace Area Development, Winterthur, 2019 –
Current state: ongoing

Network strategy 2040 and
future public transport 2050, Zurich
Current state: ongoing (with IBV Hüsler)

Contact

Zürich office

Flüelastrasse 10 8048 Zürich Switzerland (Google Maps)
T. +41 (0)43 243 6313 F. +41 (0)43 243 6315
office@hosoyaschaefer.com

Kyoto office

Jimukinoueda bldg. 602 21 Sakaimachi Gojo-Takakurakado Shimogyoku Kyoto Japan
T. +81 (0)75 744 1503
office@hosoyaschaefer.com